Lagartinho

Goalkeeper - Portimonense U20
26 Dec 2026
Saturday
Process

Events

13
  1. Praised in a satisfied full-time talk

    Minor
    Cause
    The team had won, and the manager wanted to reinforce the standards. He does not always respond well to pressure, which softened the lift.
    Outlook
    Trend is improving — relationship should keep strengthening.
  2. Criticised in a full-time post-mortem

    Minor
    Cause
    It was a private show of faith after a tough recent run. He does not always respond well to pressure, which softened the lift.
    Outlook
    Manager intervention may be required if it persists.
  3. Stayed on the bench all match

    Minor
    Cause
    The bench was built around different match options.
    Outlook
    Likely to settle unless repeated within the next few weeks.
  4. Returned to full training after injury

    Moderate
    Cause
    The medical team cleared him, but the staff are protecting him from a rushed comeback.
  5. Stayed on the bench all match

    Minor
    Cause
    The bench was built around different match options.
    Outlook
    Likely to settle unless repeated within the next few weeks.
  6. Praised by the manager

    Serious
    Cause
    The discussion covered general matters.
  7. Loan listing accepted

    Moderate
    Cause
    The clubs have agreed in principle to take him on loan.
  8. Reassured by a calm full-time message

    Minor
    Cause
    The moment called for a quiet show of support. He does not always respond well to pressure, which softened the lift.
    Outlook
    Trend is improving — relationship should keep strengthening.
  9. Reassured by a calm full-time message

    Minor
    Cause
    The moment called for a quiet show of support. He does not always respond well to pressure, which softened the lift.
    Outlook
    Trend is improving — relationship should keep strengthening.
  10. Criticised in a full-time post-mortem

    Minor
    Cause
    It was a private show of faith after a tough recent run. He does not always respond well to pressure, which softened the lift.
    Outlook
    Manager intervention may be required if it persists.
  11. Contract extension signed

    Decision
    Movement
    5y · $151.0K/y
  12. Signed a new contract

    Moderate
    Cause
    He committed to the project on terms both sides could live with.
  13. Contract renewal offered

    Decision
    Movement
    5y · $151.0K/y
    Who
    Pacheco Alexandre