Events
2
-
Signed a new contract
Moderate
- Cause
- He committed to the project on terms both sides could live with.
-
- Chosen instead
- Sifiso Hlatshwayo was preferred — his higher squad-status priority.
- Cause
- His squad status would normally start, so the omission stings.
- Outlook
- Manager intervention may be required if it persists.