Marton Lisztes

Striker - Haladas
14 May 2029
Monday
Process

Events

8
  1. Settling well into the dressing room

    Minor
    Cause
    A strong training-ground partnership is behind this. The bond between them was already strong, so the morale hit should be limited.
    Outlook
    Settling-in period is still under way.
  2. Given a personal development plan

  3. Asked the manager for a private conversation

    Moderate
    Cause
    He has unresolved concerns over his contract. His relationship with the manager is steady but tense.
    Outlook
    Manager intervention may be required if it persists.
  4. Signed a new contract

    Moderate
    Cause
    He committed to the project on terms both sides could live with.
  5. Praised by the manager

    Major
    Cause
    The discussion covered general matters.
  6. Difficult conversation with the manager

    Moderate
    Cause
    The discussion covered general matters.
  7. Returned from a failed loan with confidence knocked

  8. He never got into the team on loan

    Minor
    Cause
    3 appearances (0 starts) · 6.56 average rating